Production line design
We design the production and assembly lines for your products: process studies, workstation layout, cycle time calculation, choice between manual and automated operations, tooling and fixtures.
Industrialisation turns a product into something you can manufacture in series, at the target rate, cost and quality. Through its T&S Industrial Engineering offer, T&S designs your production lines, test benches and automation systems, then commissions them in your plants, from prototype to series production.
engineers in France in the T&S Industrial Engineering team
production lines and test benches commissioned over 15 years
engagement models: technical assistance, delivery centre or fixed-price engagement
As an industrial engineering firm, the T&S Industrial Engineering team designs and commissions the equipment that manufactures and tests your products. Our scope ranges from upgrading or adapting existing equipment to designing a test bench, an assembly station or a complete line.
A line to design, a bench to build, an installation to automate? We assess the feasibility of your project.
We design the production and assembly lines for your products: process studies, workstation layout, cycle time calculation, choice between manual and automated operations, tooling and fixtures.
We design and build functional and end-of-line test benches: test definition, instrumentation, test software and results recording. For visual inspection, we integrate machine vision, conventional or AI-based.
We program the programmable logic controllers (PLCs) that drive your machines, as well as robots, cobots and operator interfaces (HMIs). Programs follow the IEC 61131-3 languages and are tested in simulation and on the machine.
SCADA supervision lets you monitor and control installations from a central station. The MES (manufacturing execution system) tracks production orders, traceability and performance, linked to your ERP. We connect these systems to make use of your production data.
Each piece of equipment is first tested in our workshops during the factory acceptance test (FAT). After shipment and installation, the site acceptance test (SAT) validates its transfer to your plant. We then support the production ramp-up and train your teams.
Industrialisation bridges the engineering office and the plant. It relies on automation systems that control the machines and track production.
In manufacturing, industrialising a product means the studies and equipment needed to produce it in series: processes, lines, tooling, inspection and documentation. It starts during design and ends when production reaches the target rate and quality. Not to be confused with industrialisation in the historical sense: the shift to an industrial economy.
The PLC controls a machine in real time, based on its sensors and actuators. SCADA supervises an installation: it collects data, displays alarms and sends setpoints. The MES manages shop-floor production: work orders, traceability and indicators. These three industrial control systems work together.
Not sure what level of automation your production needs?
T&S supports the industrialisation of your product in four steps.
We analyse the product, target volumes, cycle time and budget, and check that it can be manufactured under these conditions. An initial process FMEA (PFMEA) identifies the process risks.
Expected result: a costed industrialisation scenario and the equipment specification.
Lines, test benches, tooling and automation are designed and simulated: layout, flows, cycle time, operator safety. Choices are validated with your production, quality and plant teams.
Expected result: an approved design file, ready for build.
The equipment is built, wired and programmed, then tested in our workshops during the FAT, against the acceptance criteria set during the study.
Expected result: equipment accepted at the factory, with its test reports.
We ship and install the equipment in your plant, run the SAT, support the ramp-up to production and quality targets, then train your teams.
Expected result: an accepted line in production and self-sufficient teams.
A line is only ready when it produces safely, with stable quality, at the planned rate. These three conditions are prepared from the study stage.
Any machine placed on the European market must meet safety requirements and bear the CE marking. We carry out the risk assessment, define guards and safety functions, then compile the technical file. The Machinery Regulation (EU) 2023/1230 replaces the Machinery Directive on 20 January 2027.
The process FMEA (PFMEA) lists, for each manufacturing step, the possible failures, their causes and the controls to put in place. Process capability, measured by the Cpk index, then checks that the process produces consistently within tolerances.
Once in service, a line is managed through its indicators, starting with OEE. We analyse the causes of stoppages, slowdowns and scrap, then upgrade the equipment: maintenance, modifications, new product references, as part of industrial performance management. We also track the equipment’s energy consumption to reduce the environmental impact of production.
The T&S Industrial Engineering team designs, connects and commissions production lines and test benches for industry, laboratories and engineering offices.
Industrial engineering designs and improves the systems that manufacture products: processes, production lines, workstations, flows and quality control. Its aim is to produce at the right rate, cost and quality, safely. It should start as early as product design and development and at T&S it covers everything from the line study to commissioning.
You start from the product, target volumes and cycle time, then break manufacturing down into operations. Each operation is assigned to a manual or automated station, and the layout is simulated to check flows and bottlenecks. The line is then built, tested at the factory (FAT) and commissioned on site (SAT).
The factory acceptance test (FAT) takes place in the workshop that built the machine, at T&S for the equipment we design, before shipment: it checks that the machine meets the specification. The site acceptance test (SAT) takes place after installation in the customer’s plant, with its utilities, products and operators. The FAT limits surprises on site; the SAT determines final acceptance.
Overall equipment effectiveness (OEE) is calculated by multiplying three rates: availability, performance and quality. For example, a machine available 90% of planned time, running at 95% of its nominal rate and producing 98% good parts, has an OEE of about 84%.
Cpk is a process capability index: it compares the spread of a process with its tolerance limits, taking into account how well it is centred. The higher the Cpk, the less likely the process is to produce out-of-tolerance parts. A Cpk of at least 1.33 is a common requirement in industry.
Describe your product, target volumes and the state of your current equipment: our teams will route your request to the most suitable engineer for an initial technical discussion.
• Your product and target volumes: prototype, small series or large series.
• Your need: complete line, test bench, automation, supervision or commissioning.
• Your constraints: lead times, cycle time, installation site or standards to meet.